Drawed Jokes / Recent Jokes

Bidding - Additional Requirements
Section 1A - The Truth
The requirements of Division 01 and of those documents under bidding
requirements and conditions of the contract and anything else we don't
think looks good here is null and void. If you know what's good for
you, you'd read this real close (meaning the contractor).
1.1 The work we did is clearly showed in the attached plans and
specifications. Our engineer, whose had plenty of college, spent one
hell of a lot of time when he drawed up these here plans and
specifications, but nobody can think of everything.
Once your bid is in - that's it, brother. From then on, anything
wanted by our engineer, or any of his friends, or anybody else (except
the contractor) shall be considered as showed, specified or implied
and shall be provided by the contractor without no expense to nobody,
but himself (meaning the contractor).
1.2 If the work is did without no expense to the more...