Drawed Jokes

  • Funny Jokes

    Bidding - Additional Requirements
    Section 1A - The Truth
    The requirements of Division 01 and of those documents under bidding
    requirements and conditions of the contract and anything else we don't
    think looks good here is null and void. If you know what's good for
    you, you'd read this real close (meaning the contractor).
    1.1 The work we did is clearly showed in the attached plans and
    specifications. Our engineer, whose had plenty of college, spent one
    hell of a lot of time when he drawed up these here plans and
    specifications, but nobody can think of everything.
    Once your bid is in - that's it, brother. From then on, anything
    wanted by our engineer, or any of his friends, or anybody else (except
    the contractor) shall be considered as showed, specified or implied
    and shall be provided by the contractor without no expense to nobody,
    but himself (meaning the contractor).
    1.2 If the work is did without no expense to the more...

  • Recent Activity